Heritage Court

A four-storey apartment building with undercroft parking, where a contractor-led switch from masonry to steel frame demanded careful detailing to design out cold-bridging. A circa £3m build.

Location
Dover, Kent
Type
Apartment building
Status
On site
Year
2023
RIBA stages
4–5
Practice
PJArchitecture
Heritage Court, Dover, Kent

A four-storey apartment building with undercroft parking, procured under a Design and Build contract. Part-way through, the contractor encouraged a change of structural system from masonry to steel frame — a decision with real consequences for the detailing.

I researched steel-frame details and built a 3D structural model from the engineers' drawings to understand exactly where columns and beams landed, so we could design out cold-bridging before it reached site. The work spanned fire-rated wall and floor build-ups, intumescent protection to exposed steel, and the smoke-vent strategy through the stair core. It became my RIBA Part 3 case study. Construction cost: around £3 million.

Watertight construction site, June 2023
Watertight construction site, June 2023
Lightweight steel frame walls under construction
Lightweight steel frame walls, June 2023
Cross section through the flats showing fire-rated build-ups
Cross section of the flats (TurboCAD)
Next projectPark Road