Copperfield

A low-carbon three-bedroom new-build, designed to beat its Target Emission Rate by at least 50%, taken from sketch design through to completion on site.

Location
Leysdown, Sheerness, Kent
Type
New-build dwelling
Status
Completed
Year
2023
RIBA stages
3–6
Practice
PJArchitecture
Copperfield, Leysdown, Sheerness, Kent

A new-build three-bedroom dwelling for a returning developer client. Planning was granted on the condition that the house achieve at least a 50% reduction in Dwelling Emission Rate against the Target Emission Rate — a brief that shaped every decision, from the fabric-first build-up to the choice of plant.

I carried the project from sketch design through to completion on site, producing all Stage 4 general arrangement drawings and submitting a Full Plans application. The detailing pairs a continuous, well-sealed thermal envelope — full-fill cavity insulation, Celotex between and across the rafters, a continuous vapour control layer — with an air-source heat pump, solar panels and an EV charging point designed in from the outset rather than added on.

Day to day, the project meant coordinating a wide cast: the client, the planning officer, the approved inspector, the energy and solar consultants, the heat-pump supplier, and statutory undertakers including Southern Water for new sewer and surface-water connections. Completed October 2023.

Perspective view of Copperfield seen from the bound-gravel driveway
Perspective view (SketchUp, Twinmotion, Photoshop)
Ground floor plan showing kitchen, living/dining and WC
Ground floor plan (TurboCAD)
Cross section through Copperfield showing roof build-up and insulation
Cross section (TurboCAD)